JOB REFERENCE
| Project Name | Application | Period |
|---|---|---|
| West Rail Yuen Long Station Property Development at YLTL No. 510 | Falsework & Metal Scaffolding Supply | 2021 – 2021 |
| The Construction of Flight Simulator Training Centre of The Government Flying Service | Metal Scaffolding Supply | 2021 – 2021 |
| Premium Modern Logistics Centre | Falsework & Metal Scaffolding Supply | 2021 – 2021 |
| HKJC Happy Valley Clubhouse | Falsework Supply | 2021 – 2021 |
| K.T.I.L. 240, How Ming Street, Kwun Tong, Kowloon | Falsework Supply | 2021 – 2021 |
| Project Name | Application | Period |
|---|---|---|
| Tseung Kwan O Lam Tin Tunnel Main Tunnel and Associated Works | Falsework & Metal Scaffolding Supply | 2020 – 2022 |
| Commercial Development at 210-212 Choi Hung Road and 15 & 17 Ng Fong Street N.K.I.L. 4854 | Falsework Supply | 2020 – 2021 |
| Shing Kai Road Substation | Metal Scaffolding Supply | 2020 – 2021 |
| Redevelopment of Kwong Wah Hospital | Metal Scaffolding Supply | 2020 – 2021 |
| Proposed Redevelopment at 23 Po Shan Road, Hong Kong I.L. 6435 & Extension | Falsework Supply | 2020 – 2021 |
| Water Supply to Remote Villages – Mui Tsz Lam Village, Sha Tin | Falsework & Metal Scaffolding Supply | 2020 – 2021 |
| Tseung Kwan O Desalination Plant | Metal Scaffolding Supply | 2020 – 2021 |
| Contract No. ED/2018/04 – Trunk Road T2 and Infrastructure Works for Developments at the Former South Apron | Metal Scaffolding Supply | 2020 – 2021 |
| Contract No.EP/SP/86/15 Organic Waste Treatment Facilities Phase 2 | Metal Scaffolding Supply | 2020 – 2021 |
| Construction of Station Square at Kai Tak (Phase 2) | Falsework Supply | 2020 – 2021 |
| Wong Chuk Hang Station | Falsework Supply | 2020 – 2021 |
| Contract No. HY/2014/20 Central Kowloon Route – Yau Ma Tei West | Falsework & Metal Scaffolding Supply | 2020 – 2021 |
| Contract No. NE/2017/02 Tseung Kwan O Lam Tin Tunnel – Road P2/D4 and Associated Works | Falsework & Metal Scaffolding Supply | 2020 – 2021 |
| HKIA Three Runway System Project – Contract 3402 – New Integrated Airport Centres | Metal Scaffolding Supply | 2020 – 2021 |
| Main Contract for Jockey Club One Health Tower (JCT) for City University of Hong Kong | Metal Scaffolding Supply | 2020 – 2021 |
| Contract No HY/2019/05 Footbridge near MTR Kowloon Bay Station Exit B | Metal Scaffolding Supply & Installation | 2020 – 2020 |
| Contract No. SS G514 Construction of Two 30-classroom Primary Schools at Queen’s Hill, Fanling | Falsework Supply | 2020 – 2020 |
| Proposed Alteration and Addition Works at Goodman Western Plaza | Metal Scaffolding Supply & Installation | 2020 – 2020 |
| South East New Territories Landfill | Metal Scaffolding Supply | 2020 – 2020 |
| Mosque Street | Metal Scaffolding Supply | 2020 – 2020 |
| Contract No. T19W007 High Voltage Chiller Replacement Work at Airport T1 | Metal Scaffolding Supply | 2020 – 2020 |
| Contruction Of A, Government Data Centre Complex At King Lam Street, Cheung Sha Wan | Falsework & Metal Scaffolding Supply | 2020 – 2020 |
| Project Name | Application | Period |
|---|---|---|
| C17W03 Sky Bridge Connecting Terminal 1 With North Satellite Concourse | Metal Scaffolding Supply & Installation | 2019 – 2021 |
| Contract No. NE/ 2017/ 03 Development of Anderson Road Quarry Site- Road Improvement Works and Pedestrian Connectivity Facilities – Phase 2A | Falsework & Metal Scaffolding Supply | 2019 – 2021 |
| Contract no. NE/2017/01 Tseung Kwan O – Lam Tin Tunnel, Tseung Kwan O Interchange and Associated Works | Metal Scaffolding Supply | 2019 – 2021 |
| Hong Kong Science and Technology Parks Corporation Works Contract No. PD/WC/209 – Development of IE 2.0 Project C Advanced Manufacting Centre at Tseung Kwan O Industrial Estate | Falsework & Metal Scaffolding Supply | 2019 – 2021 |
| Air Duct Tsim Sha Tsui MTR Station | Metal Scaffolding Supply | 2019 – 2020 |
| Castle Peak Power Station | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Cognita School Alteration Ho Man Tin | Falsework Supply | 2019 – 2020 |
| Construction of Public Housing Developments at North West Kowloon Reclamation Site 6 and Fat Tseung Street West | Metal Scaffolding Supply | 2019 – 2020 |
| Contract No 4/WSD/16 Improvement of Water Supply to Sheung Shui & Fanling | Falsework Supply | 2019 – 2020 |
| Contract No. 4/WSD/17 Uprating of Tung Chung Fresh Water Supply System – Construction of Tung Chung No. 2 Fresh Water Service Reservoir | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Contract No. DC/2018/08 “Inter-reservoirs Transfer Scheme – Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir” | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Contract no. HY/2019/01 Hong Kong- ZhuHai- Macao Bridge Hong Kong Boundary Crossing Facilities- Phase 2 and Other Works | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Contract No. NE/2015/01 Tseung Kwan O Lam Tin Tunnel Main Tunnel and Associated Works at Pier 1B of ML-1 | Metal Scaffolding Supply | 2019 – 2020 |
| Contract No. SSE501 Design and construction of Transport Department’s Vehicle Examination Centres at Sai Tso Wan Road, Tsing Yi, New Territories | Metal Scaffolding Supply & Installation | 2019 – 2020 |
| Hong Kong Theme Park | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| HKIA Contract 3503 – Terminal 2 Foundation and Substructure Works | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| HKIC – Sheung Shui campus | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Ho Man Tin KIL11264 | Metal Scaffolding Supply | 2019 – 2020 |
| Junction Road Mei Tung Estate | Metal Scaffolding Supply | 2019 – 2020 |
| Kai Tak NKIL 6566 | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| L2 Contract of Lyric Theatre Complex & Extended Basement | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Lyric Theatre Complex and Extended Basement | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Mong Kok Road Dynasty Theatre | Falsework Supply | 2019 – 2020 |
| Paul Y. Centre, 51 Hung To Road | Falsework Supply | 2019 – 2020 |
| Pennington Street | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Pine Street | Falsework Supply | 2019 – 2020 |
| Property Residential Redevlopment At 36 Severn Road, The Peak | Metal Scaffolding Supply & Installation | 2019 – 2020 |
| Public Housing Development in Fanling Area 49 Construction Works | Metal Scaffolding Supply | 2019 – 2020 |
| Sai Ying Pun Hospital Rd | Metal Scaffolding Supply | 2019 – 2020 |
| Skycity Commercial Development Site A3 | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Spectrum Tower | Falsework Supply | 2019 – 2020 |
| Student Residence Development at The HKUST | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| T1 Skypier APM Tunnel | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Tiu Keng Leng Station Metro Town, BLK 8 | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| TKO Industrial Estate | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| To Fan Au Pui Wan Street | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Tseung Kwan O Town Lot 86, Site H | Falsework Supply | 2019 – 2020 |
| Tsing Ma Bridge | Falsework & Metal Scaffolding Supply | 2019 – 2020 |
| Tung Chung Waterfront Road | Metal Scaffolding Supply | 2019 – 2020 |
| Medical Complex Extension at No. 21 Sassoon Road for The University of Hong Kong | Metal Scaffolding Supply & Installation | 2019 – 2020 |
| The Fullerton Hotel At Theme Park, Tai Shue Wan, Hong Kong | Metal Scaffolding Supply & Installation | 2019 – 2020 |
| 75 Deep Water Bay Road | Metal Scaffolding Supply & Installation | 2019 – 2019 |
| TKO TL122 – High-Tier Data Centre | Metal Scaffolding Supply & Installation | 2019 – 2019 |
| Tuen Mun – Chek Lap Kok Link | Metal Scaffolding Supply | 2019 – 2019 |
| Victoria Harbour Restaurant – Amoy Plaza Phase L1 | Metal Scaffolding Supply & Installation | 2019 – 2019 |
| “C5686 – 18C Improvement Works to CTO At KOB and Shunting at KBD” | Metal Scaffolding Supply & Installation | 2019 – 2019 |
| Project Name | Application | Period |
|---|---|---|
| Proposed Redevelopment at 22 Baker Road | Falsework & Metal scaffolding Supply | 2018 – 2019 |
| Contract No.NE/2016/01 Development of Anderson Road Quarry site-Pedestrain Connectivity System B | Falsework & Metal scaffolding Supply | 2018 – 2020 |
| Subsidized Sale Flats Project at Tseung Kwan O Area 73A | Falsework & Metal scaffolding Supply | 2018 – 2020 |
| Construction of the East Kowloon Cultural Centre Contract No.: SSE510 Project No.: 060RE |
Falsework & Metal scaffolding Supply | 2018 – 2020 |
| Main Works Contract for Proposed Residential Development at KIL 11257,Sheung Shing Street, Homantin ,Kowloon.HK | Falsework Supply | 2018 – 2019 |
| 1112 Hung Hom Station and Stabling Sidings | Metal Scaffolding Supply | 2018 – 2019 |
| Black Point Power Station | Metal scaffolding Supply | 2018 – 2019 |
| CEDD Contract No.YL/2017/01 Site Formation and Infrastructure Works for Development at Kam Tin South,Yuen Long-Advance Works | Metal scaffolding Supply & Installation | 2018 – 2019 |
| Contract 1128 SOV to Admiralty Tunnels |
Falsework & Metal scaffolding Supply | 2018 – 2019 |
| Contract No. CV/2015/02 Provision of Universal Access Facilities for Highway Structures – Package 2 Contract 2 |
Falsework & Metal scaffolding Supply | 2018 – 2019 |
| Contract No. CV/2016/08 Queen’s Hill Development – Sewage Pumping Station Works |
Falsework & Metal scaffolding Supply | 2018 – 2019 |
| Contract No. CV/2016/10 Site Formation and Associated Infrastructural Works for Development of Columbarium at Sandy Ridge Cemetery |
Falsework & Metal scaffolding Supply | 2018 – 2019 |
| Conversion of the Former French Mission Building at Battery Path, Central |
Metal scaffolding Supply & Installation | 2018 – 2019 |
| Demolition of Maxwell Industrial Building | Falsework Supply | 2018 – 2019 |
| HKIA T1 Annex & Carpark 4 Expansion Work | Falsework & Metal scaffolding Supply | 2018 – 2019 |
| HY/2012/07 Tuen Mun – Chek Lap Kok Link Southern Connection Viaduct Section |
Falsework Supply | 2018 – 2019 |
| NE/2015/02 Tseung Kwan O – Lam Tin Tunnel Road P2 and Associated Works |
Metal scaffolding Supply | 2018 – 2019 |
| NE/2016/01 Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site |
Metal scaffolding Supply & Installation, Falsework Supply |
2018 – 2019 |
| Redevelopment work At Junction of Shouson Hill Road West and Wong chuk Hang Path, Hong Kong Rural Building Lot No. 1998 |
Falsework Supply | 2018 – 2019 |
| Sai Sha Road Widening | Falsework & Metal scaffolding Supply | 2018 – 2019 |
| St. Paul’s Primary Catholic School Extension | Metal scaffolding Supply & Installation | 2018 – 2019 |
| Uprating of Tung Chung Fresh Water Supply System Construction of Tung Chung No.2 Fresh Water Service Reservoir |
Falsework & Metal scaffolding Supply | 2018 – 2019 |
| Contract P561 North Commercial District & Enabling Works | Falsework Supply | 2018 – 2018 |
| Elevated Walkway Between Tong Ming Street and Tong Tak Street, Tseung Kwan O |
Metal scaffolding Supply | 2018 – 2018 |
| P575 Airpot North Commercial District Main Infrastructure Works |
Metal scaffolding Supply | 2018 – 2018 |
| Project Name | Application | Period |
|---|---|---|
| 14105D TAWMC-Proposed Property Development on S.T.T.L No.520,Tai Wai Station | Falsework & Metal Scaffolding supply | 2017 – 2020 |
| Contract No.HY/2013/19 Retrofitting of Noise Barriers on Tuen Mun Road-Town Centre Section | Metal Scaffolding Supply & Installation | 2017 – 2019 |
| CV/2012/08 Liantang/ Heung Yuen Wai Boundary Control Point (BCP) – BCP Buildings and Associated Facilities – Site formation and infrastructure works |
Falsework & Metal Scaffolding Supply | 2017 – 2019 |
| J3688 –Global Switch Hong Kong 1 (GSHK1) Phase 2 Buildings 3, 4 and 5 for Data Centre at Tseung Kwan O |
Metal Scaffolding Supply & Installation | 2017 – 2019 |
| MTR Shatin to Central Link – Contract 1123 Exhibition Station and Western Approach Tunnel |
Falsework & Metal Scaffolding Supply & Installation |
2017 – 2019 |
| NWKR Site 6 Footbridge | Metal Scaffolding Supply & Installation | 2017 – 2019 |
| PRH Redevelopment at Pak Tin Estate (Phases 7, 8 & 11) | Falsework & Metal Scaffolding Supply | 2017 – 2019 |
| Proposed Commercial Redevelopment at 704-730 King’s Road and 201-227 Tsat tsz Mui Road |
Metal Scaffolding Supply & Installation | 2017 – 2019 |
| Tai Shue Wan Theme Park Water World Project | Falsework & Metal Scaffolding Supply | 2017 – 2019 |
| Contrace No. HY/2009/19 Central – Wan Chari Bypass Tunnel (North Point Section) and Island Eastern Corridor Link |
Falsework & Metal Scaffolding Supply | 2017 – 2018 |
| Contract No. HY/2014/12 Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 6 |
Falsework & Metal Scaffolding Supply & Installation |
2017 – 2018 |
| HY/2014/14 Retrofitting of Noise Barriers on Tuen Mun Road (Fu Tei Section) |
Metal Scaffolding Supply & Installation | 2017 – 2018 |
| Lohas Park Road and the Pedestrian Footbridge | Falsework Supply | 2017 – 2018 |
| Phase 2A Building TaiKoo place, Quarry Bay, Hong Kong |
Falsework & Metal Scaffolding Supply | 2017 – 2018 |
| West Kowloon Government Offices | Falsework Supply | 2017 – 2018 |
| Cathay Pacific Cargo Terminal | Metal Scaffolding Supply & Installation | 2017 – 2017 |
| Refurbishment to Soccer/Hockey Pitch at Po Tsui Park TKO NT |
Falsework Supply | 2017 – 2017 |
| Yew Chung Private Independent School | Metal Scaffolding Supply | 2017 – 2017 |
| Project Name | Application | Period |
|---|---|---|
| CV/2014/02 Provision of Universal Access Facilities for Highway Structures |
Falsework & Metal Scaffolding Supply | 2016 – 2019 |
| Advance Works for Shek Wu Hui Sewage Treatment Works – Further Expansion Phase 1A and Sewerage Works at Ping Che Road |
Falsework & Metal Scaffolding Supply | 2016 – 2018 |
| Contract No. HY/2012/07 Tuen Mun – Chek Lap Kok Link Southern Connection Viaduct Section |
Falsework & Metal Scaffolding Supply | 2016 – 2018 |
| Site Formation and Infrastructural Works near Tong Hang Road and Tsz Tin Road in Area 54, Tuen Mun |
Falsework & Metal Scaffolding Supply | 2016 – 2018 |
| The Construction of Open Space at Hing Wah Street West, Sham Shui Po |
Falsework Supply | 2016 – 2018 |
| Chai Wan VTC | Falsework & Metal Scaffolding Supply & Installation |
2016 – 2017 |
| Contract No Q036895 Maritime Sqaure Extension Works |
Falsework & Metal Scaffolding Supply & Installation |
2016 – 2017 |
| Contract No. DC/2012/03 – Happy Valley Underground Stormwater Storage Scheme |
Falsework Supply | 2016 – 2017 |
| Hong Kong-Zhuhai – Macao Bridge Hong Kong Boundary Crossing Facilities – Infrastructure |
Falsework Supply | 2016 – 2017 |
| Proposed Composite Building at No.18 and 20 Caine Road, Hong Kong |
Falsework & Metal Scaffolding Supply | 2016 – 2017 |
| Proposed Comprehensive Development at Oil Street, North Point, I.L.8920 |
Falsework Supply | 2016 – 2017 |
| Proposed Residential Development at NKIL No.6526, Kai Tak area 1l, site 2 Kai Tak, Kowloon |
Falsework Supply | 2016 – 2017 |
| TW6 – West Rail Tsuen Wan Station | Falsework & Metal Scaffolding Supply & Installation |
2016 – 2017 |
| Wan Chai Development Phase II-Central-Wan Chai Bypass at Wan Chai East |
Falsework Supply | 2016 – 2017 |
| Shek Kip Mei Estate Phase 6 | Metal Scaffolding Supply & Installation | 2016 – 2016 |
| Museum Plus (M+) of The West Kowloon Cultural District |
Falsework & Metal Scaffolding Supply | 2015 – 2019 |
| Contract 810A West Kowloon Terminus Station North |
Falsework & Metal Scaffolding Supply | 2015 – 2018 |
| Contract No. HY/2011/03 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road – Section Between Scenic Hill and Hong Kong Boundary Crossing Facilities |
Falsework & Metal Scaffolding Supply | 2015 – 2018 |
| CV/2013/08 Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 |
Falsework & Metal Scaffolding Supply | 2015 – 2018 |
| CV/2012-07 Development at Anderson Road – Footbridge D and Associated Works |
Metal Scaffolding Supply | 2015 – 2017 |
| Hong Kong Theme Park H3 Hotel | Falsework & Metal Scaffolding Supply | 2015 – 2017 |
| Conserving and Revitalising Murray Building | Falsework & Metal Scaffolding Supply | 2015 – 2017 |
| Contract 1002 Whampoa Station and Overrun Tunnel |
Falsework & Metal Scaffolding Supply | 2015 – 2016 |
| Contract No. HY/2010/08 Central – Wan Chai Bypass and Island Eastern Corridor Link |
Falsework Supply | 2015 – 2016 |
| DC/2012/04 Village Sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang |
Falsework & Metal Scaffolding Supply | 2015 – 2016 |
| DC/2012/08 Ma Po Mei Sewage Pumping Station |
Falsework & Metal Scaffolding Supply | 2015 – 2016 |
| DC/2012/08 She Shan Tsuen Sewage Pumping Station |
Falsework & Metal Scaffolding Supply | 2015 – 2016 |
| DC/2012/08 Pak Ngau Shek Sewage Pumping Station |
Falsework & Metal Scaffolding Supply | 2015 – 2015 |
| Contract No. KL/2011/02 Infrastructure works for housing sites adjacent to Lung Ping Road at Tai Wo Ping, Shek Kip Mei |
Falsework Supply | 2014 – 2017 |
| MTRC1109 | Falsework & Metal Scaffolding Supply & Installation |
2014 – 2016 |
| New World Centre Remodeling Project – High-rise Hotel and Commercial Building |
Falsework & Metal Scaffolding Supply | 2014 – 2016 |
| KET 1001 HO MAN TIN STATION | Falsework & Metal Scaffolding Supply | 2014 – 2016 |
| Proposed New Building Lot No. S.T.T.L. 412 3 On Kwan Street Sha Tin, N.T. |
Falsework & Metal Scaffolding Supply | 2014 – 2015 |
| TKOTL 126 Tseung Kwan o Residential and Commercial Development | Falsework & Metal Scaffolding Supply | 2014 – 2015 |
| MTRC 908 | Falsework & Metal Scaffolding Supply | 2013 – 2014 |
| No. 2-6 Sha Tsui Road, 20-Storey Office Building |
Falsework & Metal Scaffolding Supply | 2013 – 2014 |
| No. 52-56 Tsun Yip Street, 33-Storey Office Building |
Falsework & Metal Scaffolding Supply | 2013 – 2014 |
| XRL Contract 820 | Falsework & Metal Scaffolding Supply | 2013 – 2014 |
| XRL Contract 823A | Falsework & Metal Scaffolding Supply & Installation |
2013 – 2014 |
| XRL – 823B Shek Kong Stabling Sidings & ERS | Falsework & Metal Scaffolding Supply & Installation |
2012 – 2014 |
| HKA – New School Campus in Sai Kung | Falsework Supply | 2012 – 2013 |
| XRL – 810B West Kowloon Terminus Station South | Falsework & Metal Scaffolding Supply & Installation |
2011 – 2015 |
| KIL6545 Chatham Road – Chatham Garden | Falsework Supply | 2010 – 2011 |
| Proposed Residential Redevelopment on TMTL No.334 at Tsing Yung St. Tuen Mun N.T. |
Falsework Supply | 2010 – 2011 |
| Proposed Development at MTR West Rail Tuen Mun Station, TMTL 447 |
Falsework Supply | 2009 – 2012 |
| Redevelopment at Larch Street & Fir St., Tai Kok Tsui. |
Falsework & Metal Scaffolding Supply & Installation |
2009 – 2011 |